|

The
2004 Houses of the Future project
which will feature six houses, each made of a different base material.
Each architect-designed house will be environmentally-sustainable,
affordable and futuristic:
|
|
| |
|
|
The
brief
Each house design had to be:
Pre-fabricated for easy transportation, and to allow erection
on site in less than 4 days;
Environmentally sustainable with sensitive use of materials,
rainwater recycling, use of solar panels and passive solar design;
Compliant with the NSW BASIX
ratings tool;
Designed by an Architect; and
Futuristic in appearance and use of domestic space.
Sydney Olympic Park Authority wishes to thank Multiplex
for providing the overall project management of the Houses of the
Future project.
|
|
|